Manual: Maintenance of Kobelco SK210LC & SK250LC Hydraulic Excavators
Download Full Manual of Maintenance of Kobelco SK210LC & SK250LC Hydraulic Excavators Free in English and PDF.
Full Manual – Learning
KOBELCO SK210LC & SK250LC
HYDRAULIC EXCAVATORS
General Information, General Safety, Inspection & Maintenance Chart, Fluids & Filters, Required Fluids & Capacities, Required Filters, Kobelco Fluids And Lubricants, Lubricant Specifications, Pre-start (Every 8 Hrs.) Inspection & Maintenance, Engine Oil Level, Engine Coolant Level, Engine Fluid Leaks, Air Cleaner, Engine Electrical, Fuel Level, Hydraulic Oil Level, Hydraulic Functions, Hydraulic Oil Leaks, Machine Electrical, Steps And Handrails, Frame Structure, Tracks & Components, Track Tension, Boom & Arm, Cutting Edge, Bucket Teeth & Side Cutters, Attachment Lubrication, 50 Hour (weekly) & New Machine Break–In Inspection & Maintenance Procedures, Engine Oil And Filter Element, Water Pump Bearing Lubrication, Fuel Tank Drain, Water Separator, Air Intake System, Radiator, Oil Cooler & Debris Screen, Fuel Filters, Replacing Fuel Filter, Cleaning Priming Pump Strainer, Bleeding Air From Fuel System, Hydraulic Return Filter, Pilot Line Filter, Batteries, Fan And A/c Belt Wear & Tension, Slewing Ring And Swing Bearing Lubrication, Slewing Ring, Swing Bearing Lubrication, Checking Slewing Ring Attaching Bolts For Proper Torque, Oil Level In Swing And Travel Reduction Units, Inspecting Counterweight Attaching Bolts For Proper Torque, 120 Hour Inspection & Maintenance Procedures, Control Lever Joint Lubrication, Swing Motor Reduction Oil, Travel Motors Reduction Oil (for SK210 (LC) -vi), Travel Motors Reduction Oil (for SK250lc-vi & SK250NLC-VI), 250 Hour (3-month) Inspection & Maintenance Procedures, Fan And A/c Belt Wear And Tension, Fan Belts, Air Conditioning Compressor Belt, Climatizer-Ac Unit Filter Inspection, Fresh Air Filter, Recirculate Air Filter, Checking The Radiator Cap & Hoses, 500 Hour (6-month) Inspection & Maintenance Procedures, Change Oil In Travel Motor Reduction Units (SK210(LC)-VI, SK250(LC)-VI & SK250NLC-VI), SK250(LC)-vi And SK250nlc-vi, Change Oil In Swing Reduction Unit, Checking And Cleaning Fuel Tank And Strainer, Checking The Air Conditioner Refrigerant, Fuel System Injection Pressure And Nozzle Condition (Atomization), 1000 Hour (12-month) Inspection & Maintenance Procedures, Engine Valve Clearance, Engine Compression Pressure, Inspection Of Starter And Alternator, Engine Fuel Injection Timing, 2000 Hour Inspection & Maintenance Procedures, Engine Coolant Change, Removal And Installation Of Radiator, Change Hydraulic Oil, Hydraulic Tank Breather, Maintenance On Rollers And Idlers, Periodical Inspection Items, Dust Seals, Attachment, Bucket, Arm & Link Clearance, Reversing Bucket, Removing The Bucket, Installing The Bucket, Bucket Teeth And Side Cutters, Change Slewing Ring Grease Bath, Windshield Washer Reservoir, Fuses, Hydraulic Lines, Tubes And Hoses, Foam Seals, Machine Storage, Prepare Machine, Care During Storage, Removing Machine From Storage, Inspection Maintenance Check List…
- Pages: 63
- Size: 9.09 MB
- Format: PDF (Adobe Reader)
MANUAL – MAINTENANCE – SERVICE – HYDRAULIC – EXCAVATOR – HEAVY – EQUIPMENT – KOBELCO
MANUAL FREE FOR PROFESSIONALS IN KOBELCO HYDRAULIC EXCAVATORS – LEARNING